Skip to content
Subfield retrofit enhanced treatment system
$39,950 · PreorderReserve with $5,000
Concept rendering of three Subfield R6 parts: the In-Tank Smart Hub, the Media & Aeration Unit, shown as four sectional modules with media packs mounted over the air rack, and the Sensor Spine.

01 · The system

Eight serviceable parts. One system.

A wall station, a smart hub and six parts for the tank, each designed to lift out on its own.

Part by part

From the parts to your tank.

  1. Concept rendering: the in-tank R6 parts turning slowly.
    Concept rendering · not a released design · untested

    02 · All the way around

    The parts that go inside your tank.

    A smart hub and six in-tank parts. The Control & Air Station stays on the house wall.

  2. Concept rendering: the In-Tank Smart Hub pulled apart into its serviceable pieces.
    Concept rendering: the Media & Aeration Unit pulled apart into its serviceable pieces. Shown as four sectional modules, each with its media pack mounted over the diffusers and its own lift frame. Concept; design in progress.
    Concept rendering · not a released design · untested

    03 · Pulled apart

    Designed to come apart for service.

    In-Tank Smart Hub lifts out. Media & Aeration Unit modules lift out by their lift frame.

  3. Concept rendering, front cut away: a typical two-compartment concrete septic tank with two standard 24-inch access risers, the Subfield system inside both compartments, the outlet line to a drainfield trench, and the wall station on the house with one buried line to the compartment-2 riser.
    Concept rendering · not a released design · untestedInstalled views show an illustrative standard two-compartment concrete tank with two 24-inch access ports. Every in-tank part is shown going in and out through those ports; the combined media and aeration unit is shown as sectional modules, a design still in progress. They are not your tank and do not show that the system fits any particular tank.

    04 · In your tank

    Two compartments. Two 24-inch ports.

    Compartment 1 settles. Compartment 2 treats, polishes and pumps. One buried line connects the wall station.

    1. 01Control & Air Station, on the house wall (chapter 06)
    2. 02In-Tank Smart Hub
    3. 03Sensor Spine
    4. 04Media & Aeration Unit
    5. 05Top-Discharge Pump
    6. 06Vertical Gravity UV
    7. 07Replaceable Sensor Pod, on the sensor spine
    8. 08Non-Float Level Sensors
  4. Concept rendering: the compartment-2 lid set aside, the smart hub parked on the grass and one sectional media and aeration module lifted by its lift frame up out of the 24-inch riser.
    Concept rendering · not a released design · untestedInstalled views show an illustrative standard two-compartment concrete tank with two 24-inch access ports. Every in-tank part is shown going in and out through those ports; the combined media and aeration unit is shown as sectional modules, a design still in progress. They are not your tank and do not show that the system fits any particular tank.

    05 · Service from above

    Serviced through the same ports.

    The compartment-2 lid comes off; modules lift through the 24-inch port.

  5. Concept rendering of the Control & Air Station.
    Concept rendering · not a released design · untested

    06 · Control & Air Station

    The wall station.

    Controls and air supply stay outside on the house wall.

What's in the system

Eight parts. Each one explained.

Choose a part. See where it sits, how it comes out and what remains untested.Note 1

Concept rendering of the Control & Air Station, assembled.
Concept rendering · not a released design · untested
Untested concept

01 Control & Air Station

A slim wall station with the controls and the air supply. One combined power, data and air line runs to the tank.

Where it sits
Outside, on the house wall. One buried hybrid line to the compartment-2 riser
How it's serviced
Front service: the electronics cover, air tray and intake filter come out from the front.
Still open
The compressor is a reserved space in the design, not a chosen or tested compressor.
See every part collection

Where it goes

Inside the tank you already have.

The existing tank stays. Everything goes inside it, through its two standard 24-inch access ports.

Concept rendering: compartment 1 with the sensor spine, and compartment 2 with the sectional modules of the combined media and aeration unit, gravity UV, level sensors, pump and the smart hub docked in the 24-inch riser.
Concept rendering · not a released design · untestedInstalled views show an illustrative standard two-compartment concrete tank with two 24-inch access ports. Every in-tank part is shown going in and out through those ports; the combined media and aeration unit is shown as sectional modules, a design still in progress. They are not your tank and do not show that the system fits any particular tank.
  • House wall

    Control & Air Station

  • Compartment 1 · settling

    Sensor Spine · Replaceable Sensor Pod

  • Compartment 2 · treatment

    In-Tank Smart Hub · Media & Aeration Unit · Top-Discharge Pump · Vertical Gravity UV · Non-Float Level Sensors

Development preview. Host-tank compatibility, treatment capacity, approvals and service intervals are not yet released. Planning boundaries

Why people look at Subfield

  • Keep your tank

    Detail: Keep your tank

    A qualified host-tank and adapter range—not a promise that one size fits every installation.

  • Maintenance without surprise.

    Detail: Maintenance without surprise.

    Design goals: plain-language status, reasons for service and a clear cost before work.

  • Service from above

    Detail: Service from above

    Individually retrievable modules, identified components and useful records for the next professional.

  • A record that stays

    Detail: A record that stays

    A property service record is a feature in development, not something available today.

Retrofit or full replacement?

Planning questions for a qualified professional. Subfield remains in development.

Compare planning questions
Costs vary by site and are not compared here. Neither path guarantees your drainfield can stay.
ReviewSubfield retrofitFull replacement
TankSuitable tank retained after review.Review need for replacement.
DiggingReview existing access ports and site work.Review excavation and replacement layout.
TreatmentQualify the complete retrofit configuration.Select a system that meets the site requirements.
Knowing what is dueStatus and service records: design goals.Ask how inspections and service are recorded.
When you sellProperty record: a feature in development.Gather permits, inspections and service history.

01 / Product information

Specs, honestly.

A development preview, not a released configuration.

Product context

A coordinated retrofit platform for an existing tank. Qualification begins with the existing tank’s condition, geometry, usable volumes, access and approved downstream system. Treatment, mounting, circulation, clarification and protection must work as one reviewed configuration.

The Subfield retrofit enhanced treatment system is sold directly by Subfield. There is no online store or checkout yet: send an order request and the Subfield team handles the order from there, starting with whether your existing tank qualifies.

System

Product
Subfield retrofit enhanced treatment system
Status
In development
Exact dimensions & ratings
Pending qualified product release
Orderable variants
Not released; this preview selects no configuration
Treatment capacity
Published at release

Fit

Intended location
Inside a qualified existing standard two-compartment concrete tank, through its two standard 24-inch access ports, with appropriate dry exterior equipment and the approved disposal interface.
We review your tank
We check your tank, site and local rules before anything is confirmed.

Power & controls

Wall station
Outside, on the house wall. One buried hybrid line to the compartment-2 riser
Controls & air
A slim wall station with the controls and the air supply. One combined power, data and air line runs to the tank.
Air supply
The compressor is a reserved space in the design, not a chosen or tested compressor.
Electrical specification
Published at release

Service

Access
The existing tank stays. Everything goes inside it, through its two standard 24-inch access ports.
Pump
No motor, pump size or duty has been chosen.
Maintenance interval
Published at release
Manuals & warranty
Configuration-specific documents and reviewed terms pending

Documents

Released documents
No documents are published yet.
Open the document library

Subfield is an engineering-development program. There is no released structural rating, electrical specification, final pump selection, independently verified treatment performance or maintenance interval yet.

02 / Compatibility

Qualify the tank and the whole site.

Tank, access and disposal are reviewed together.

Compatibility context

Review tank integrity, usable volumes, baffles, access, ventilation and the approved disposal system together. Nominal tank gallons do not establish treatment capacity.

  1. Eligibility before equipment

    Detail: Eligibility before equipment

    Record actual condition, geometry, working volumes and access.

  2. Survey the existing installation

    Detail: Survey the existing installation

    Missing critical information means further review—not assumed compatibility.

  3. A measured fit. Not a universal promise.

    Detail: A measured fit. Not a universal promise.

    A damaged, undersized or inaccessible tank may not qualify. The tank, in-tank equipment and disposal arrangement require configuration-specific review.

  • 01

    Host-tank structure, usable volumes and module extraction

    Verify: Host-tank structure, usable volumes and module extraction

    Confirm against the released documentation and approved installation record before use.

  • 02

    Actual influent loading and demonstrated effluent performance

    Verify: Actual influent loading and demonstrated effluent performance

    Confirm against the released documentation and approved installation record before use.

  • 03

    Ventilation, utilities, protection and approved disposal

    Verify: Ventilation, utilities, protection and approved disposal

    Confirm against the released documentation and approved installation record before use.

An order request does not establish compatibility.

Understand eligibility

03 / Service approach

Plan the next service call.

Service starts with the installed record.

Service context

Plan professional access, normal pumping, required inspections and component-specific care from the beginning. A three-to-five-year hardware-service goal is not a published care schedule or permission to omit required visits.

01

Qualify access

Detail: Qualify access

Preserve ordinary pumping, required inspection and independent removal paths in the actual host tank.

02

Keep the record

Detail: Keep the record

Retain host measurements, approved configuration, installed revisions, commissioning and service contacts.

03

Follow the care plan

Detail: Follow the care plan

Use the released configuration-specific schedule. Pumping, mandated visits and purchased-pump obligations remain separate from hardware-life goals.

04 / Ownership

Maintenance without surprise.

Design goals: plain status, service context and a record that stays with the property.

  • 01

    Know how it is doing

    Detail: Know how it is doing

    Plain-language status, so an ordinary day needs no attention and a problem is explained instead of guessed at.

  • 02

    Know what is due, and why

    Detail: Know what is due, and why

    Service planned from the system’s own record and condition, with the reason explained.

  • 03

    See the cost first

    Detail: See the cost first

    A clear description of the work and what it will cost before the work is done.

  • 04

    A record that stays with the property

    Detail: A record that stays with the property

    A service and ownership record that stays with the property when it changes hands: its configuration, service, repairs and component changes. This is a feature in development, not something available today.

Development boundary

Subfield is not designing a maintenance-free system. The design goal is maintenance without surprise: you know how the system is doing, what service is due and why, and what work will cost before it is done, with fewer surprise visits.

Subfield is an engineering-development program. There is no released structural rating, electrical specification, final pump selection, independently verified treatment performance or maintenance interval yet.

These are design goals, not promises. Pumping, required inspections, wear parts and purchased-pump care still matter, and no maintenance interval has been established. Subfield’s planned launch focus is Santa Cruz County, California. That is a plan, not a county approval: the system has no county approval, and none is installed there.

05 / Before you order

A few useful answers.

Open what matters now.

Does it fit every septic tank?

No. The objective is broad coverage through a qualified range of host tanks and adapters. Condition, geometry, access, usable treatment and solids-storage volume, ventilation and the downstream field must all be reviewed.

Is it rated for 600 gallons a day?

Not yet. Approximately 600 US gallons per day is an initial development duty. A rating requires testing of the complete configuration at defined wastewater loads and operating conditions.

Will it be maintenance-free?

No. The goal is maintenance without surprise, not maintenance-free: knowing how the system is doing, what service is due and why, and what work will cost before it is done, with fewer surprise visits. These are design goals, not promises. Pumping, required inspections, wear components and purchased-pump care remain; a three-to-five-year interval is not established.

Who should install the system?

Anyone can buy the Subfield retrofit enhanced treatment system, but we strongly prefer that it be installed by a licensed septic or onsite wastewater professional. Local codes and permit requirements apply; check with your local health department or permitting authority before installing.

Is the system finished?

Not yet. Subfield is an engineering-development program. There is no released structural rating, electrical specification, final pump selection, independently verified treatment performance or maintenance interval yet.

See all questions

Notes

  1. Earlier component and tank studies remain available with their original context. No image transfers treatment, fit or manufacturing qualification to this retrofit. Browse the research archive ↩︎