Who it’s for / Regulators & counties
For regulators and county officials.
Everything on this website is pre-release.
Development boundaries
The Subfield retrofit enhanced treatment system is sold directly by Subfield. There is no online store or checkout yet: send an order request and the Subfield team handles the order from there, starting with whether your existing tank qualifies. A request is not a confirmed order, a reservation or a compatibility decision. No payment is taken on this website.
For the retrofit system, host-tank compatibility, treatment capacity, approvals and service intervals are not yet released.
Subfield is an engineering-development program. There is no released structural rating, electrical specification, final pump selection, independently verified treatment performance or maintenance interval yet.

About this concept rendering
Installed views show an illustrative standard two-compartment concrete tank with two 24-inch access ports. Every in-tank part is shown going in and out through those ports; the combined media and aeration unit is shown as sectional modules, a design still in progress. They are not your tank and do not show that the system fits any particular tank.
What Subfield is.
Planning details: What Subfield is.
- About Subfield
- Subfield is developing one product: the Subfield retrofit enhanced treatment system, for qualified existing septic tanks.
- What this website does not claim
- Product pages describe development targets, not released ratings. Compatibility with a specific tank, treatment performance, certifications and approvals still require engineering, testing and release.
- The treatment path
- Preserve primary settling · Bring biology and air together · Protect the outlet · Check the actual result · Respect the existing site design
- The downstream system
- No guaranteed drainfield restoration, universal soil compatibility, potable-water output or unrestricted reuse is claimed.
Approval and records.
Planning details: Approval and records.
- Installation planning stages
- Obtain applicable design and permit approval before physical changes.
- Connected ownership
- Homeowners, installers, maintainers and authorized officials need different tools. A shared installation record should make handoffs clearer without granting everyone control of the equipment.
- Planned official access
- Review explicitly shared installation, permit, maintenance and laboratory records with scoped permissions.
Common questions.
Not published yet.
Documents and evidence
- State and local approvals
- Not published yet. Certifications and state or local approvals will be published only when they are established. Approval status
- Laboratory and performance data
- Not published yet. Laboratory evidence establishes the water-quality result. Equipment status or clear-looking water is not a substitute for laboratory evidence.
- Documents for review
- Not published yet. Configuration-specific documents and reviewed terms are pending. Document library
Ask about review and records.
An inquiry is not an order, a reservation or an installation approval.