Who it’s for / Engineers & designers
For engineers and system designers.
A modular wastewater-treatment retrofit being developed inside suitable existing standard two-compartment concrete tanks, installed and serviced through two 24-inch access ports.
Development boundaries
Original Subfield assemblies, clear connections and service access.
Product pages describe development targets, not released ratings. Compatibility with a specific tank, treatment performance, certifications and approvals still require engineering, testing and release.

About this concept rendering
Installed views show an illustrative standard two-compartment concrete tank with two 24-inch access ports. Every in-tank part is shown going in and out through those ports; the combined media and aeration unit is shown as sectional modules, a design still in progress. They are not your tank and do not show that the system fits any particular tank.
The treatment process.
Planning details: The treatment process.
- The treatment path
- Preserve primary settling · Bring biology and air together · Protect the outlet · Check the actual result · Respect the existing site design
- Biological treatment
- Capacity, energy use, cold-weather behavior and effluent results require complete-configuration testing. A 600-gallon/day development duty is not a rating.
- Check the actual result
- Accessible sampling and configuration-specific testing establish effluent performance. Equipment status or clear-looking water is not a substitute for laboratory evidence.
Design boundaries.
Planning details: Design boundaries.
- The receiving tank
- A damaged, undersized or inaccessible tank may not qualify. The tank, in-tank equipment and disposal arrangement require configuration-specific review.
- Local operation
- Loss of internet is not loss of power. A cut power/data trunk does not leave imaginary tank power or surviving measurements.
- Installation detail
- Electrical ratings, environmental qualification and independent protection remain release gates. No generic hot-plug or wet-mate claim is made.
- The downstream system
- No guaranteed drainfield restoration, universal soil compatibility, potable-water output or unrestricted reuse is claimed.
Earlier research.
Planning details: Earlier research.
- Design research archive
- Research archive—not the current retrofit’s manufacturing specification. None of these studies establishes fit, capacity, dimensions or approval.
Common questions.
Not published yet.
Documents and evidence
- Spec sheets, drawings and CAD downloads
- Not published yet. Development preview. Host-tank compatibility, treatment capacity, approvals and service intervals are not yet released. Model views are development studies rather than released product geometry. Document library
- Treatment ratings and test data
- Not published yet. A rating requires testing of the complete configuration at defined wastewater loads and operating conditions.
Ask a technical question.
An inquiry is not an order, a reservation or an installation approval.