The retrofit / Installation planning
The intended installation begins with eligibility and ends with an understandable, serviceable system. No-entry access and clear connections are design requirements—not permission to skip site review.
Development preview. Host-tank compatibility, treatment capacity, approvals, pricing and service intervals are not yet released.
This is a planning guide, not field installation instructions. Qualified products, released procedures and applicable approvals are required before physical work.
The receiving structure
The survey checks actual structure, watertightness, compartments, pipe elevations, usable treatment and solids-storage volume, access, mounting, ventilation and downstream disposal.
Host family under evaluation. Material alone does not establish eligibility.
Host family under evaluation. Material alone does not establish eligibility.
Host family under evaluation. Material alone does not establish eligibility.
The outcome is eligible as surveyed, eligible after specifically reviewed corrections, or not compatible. Unknown critical information stays unresolved; an additional wastewater pod is not hidden in the base offer.
From review to ownership
Gather the permit and system history, then have the receiving tank and field assessed by the appropriate professional.
Select only a released host-tank adapter and treatment arrangement that meets the application and jurisdiction requirements.
Arrange isolation, professional pump-out and inspection as required by the approved installation procedure.
The installation objective is independently handled modules through qualified riser openings, with the correct adapters and defined service clearances.
Document hydraulic, air, alarm and operating checks. Mechanical completion is separate from biological startup and any required performance sampling.
Provide the owner with clear status guidance, service contacts, required care and the installation record.
Prepare a useful brief
Do not open or enter a tank to complete this list. Bring available records and have measurements or inspections performed safely by the appropriate professional.
Prepare a retrofit briefThe years after installation
Our goal is independently retrievable equipment, accessible wear interfaces and clear records. The eventual care plan must include normal pumping, required inspections, purchased-pump obligations and actual hardware service evidence.
Mechanical installation and biological readiness are separate milestones. A three-to-five-year hardware service goal is not an approved inspection interval or a promise of unattended treatment.
Before you begin
Understand the product direction, its limits and what must be proven before an installation.
No. The objective is broad coverage through a qualified range of host tanks and adapters. Condition, geometry, access, usable treatment and solids-storage volume, ventilation and the downstream field must all be reviewed.
No additional wastewater tank or pod is part of the base retrofit concept. Suitable dry equipment housing and existing approved dosing infrastructure may still be needed. A site that cannot meet the configuration requirements may not qualify.
No. The proposed core is an aerobic biological process supported by fixed media, with controlled circulation and protected solids separation. Required coarse protection or field filtration performs a different job.
Not yet. Approximately 600 US gallons per day is an initial development duty. A rating requires testing of the complete configuration at defined wastewater loads and operating conditions.
No. The goal is to reduce avoidable intervention and develop hardware servicing around normal pump-out where evidence and approval permit. Pumping, required inspections, wear components and purchased-pump care remain; a three-to-five-year interval is not established.
No. Pumps are the explicit purchased exception to our original-assembly manufacturing plan. The air-pump or blower production arrangement remains under evaluation.
Not yet. This is a development preview. Released configurations, qualified instructions, local approval, commercial terms and availability must be established first. An inquiry is not a purchase, reservation or compatibility decision.
Essential treatment and required local alarms are being designed not to depend on cloud access or a subscription. A power outage is different and must follow the qualified, finite-reserve failure plan.
Start with the installation you have
Bring the records and questions you already have. A project brief starts the conversation; it does not approve a tank or reserve equipment.